To: All Express Module Members cc: Shelby Adams
All Firing Operators Andy Penny
Sharon Sheets Ray Spitz
Greg Vitek
From: Scott Daugherty
Date: 2/16/89
Subj: Corrective Action Needed in the Forming Area
===============================================================================
Our customer, the Metalization Module, has a list of items they have
identified for corrective action by the Forming area. I will list the actions
that we must take to meet their requirements.
1. We must ensure a consistent delivery of JB's to the Metalization
Module. This means one 'D' lot per shift of approximately 1.1 million pieces
from the Express Module and two 'H' lots per day. Any time a JB
lot comes off Harper 5 or out of a cladan that lot has priority
to get to the Metalization module. I never want to see a
complete JB lot sitting in the furnace area.
2. The weight of the boxes of product we send to the Metalzation
Module must not exceed 16 pounds. This equates to putting no more than 1 inch
of ware in a box. To achieve this we will do the following:
A. Put only 1 cladan per box of ware.
B. Unload no more than 5 pusher tiles of ware per box off
Harper 5.
To check ourselves, no box sent to the Metalization module should contain more
than 200,000 pieces and if it is over, we must split the lot into more boxes.
3. The computer for the '.1 JB Cont Line' has been modified to accept
piece count. After you enter the number of cladans, clear the pieces column
and enter the actual weighed piece count.
4. Fill out lot cards completely and correctly, all incorrect lot
cards will be treated as a serious performance issue.
5. There will be PDC's issued over the next week dealing with angle
cuts, and loading/unloading pallets. Read them and follow their procedures.